top of page
20241126_135758 tracks.jpg
Wright Solutions logo copyright

Projects

Commercial Building Expansion

Vernal, UT

  • "Grubbing" removal of top soil and organic material

  • ​Grading site with drainage and water retention pond

  • Foundation excavation

  • Utility and water line installation including electrical conduit and sewer main tie in.

  • Grease trap installation

  • Parking lot prep

  • Storm drain installation

Campground Construction

Jensen, UT

  • Septic system installation

  • Grading site with water retention

  • Graveling area

  • Sprinkler system installation

  • Landscaping

Residential Building Foundation and Earthworks

Horseshoe Bend Rd

  • Site preparation for building foundation

  • Imported material for elevated construction pad

  • Back fill and compaction for foundation

  • Septic system installation

  • Utility lines for water and electric

Septic Installation

Steinaker State Park

  • Septic system installation for new campground construction

  • Site grading

Road Construction

Road Construction

Vernal, UT

  • Building a road base for a new construction on a residential building lot

Residential Building lot

Bluebell, UT

  • Specialty foundation work

  • Imported and compacted 4 ft of clay around perimeter of foundation to prevent water intrusion into building.

bottom of page